Jereh Oil & Gas Engineering Corporation

SHE 002353
LoginLogin | Jereh Group|  
Login!

More exclusively VIP rights can be enjoyed after registration:

  • ◆ VIP service, priority access to product information and to download related images
  • ◆ Enjoy more super valued after-sale services of the products
  • ◆ The first to receive the information of new products release and special event
Registration
Industry:
Natural Gas Liquefaction

Skid Mounted LNG Plant

Skid Mounted LNG Plant
Share by E-mail Print this page

For small factories with treatment capacity from 176MSCFD to 10,600MSCFD, Jereh can provide skid-mounted solutions to meet the demand for different plant scale.
Include:Regulating-metering skid、Feed gas compression skid、Acid gas removal skid、Dehydration and mercury removal skid、Refrigerant compression skid、Cold box、Instrument control skid and power distribution skid.

Main features:
Processing capacity 0.2-11.2MMSCFD
Refrigeration energy consumption ≤450kw/tons
Device operating flexibility 50 ~ 110%

Structure Features:
Detachable skid mounted design, easy to install and move.
◆ Detachable skid mounted design and container design are adopted for easy moving and transportation. Less work is required for on-site installation, shortening the construction period;
◆ Manufacturing and assembly of equipment are completed in the factory to ensure high production quality.
Standardized and modularized design with high stability and adaptability
◆ Compact structure covers little space with low investment; flexible layout per different plant conditions; strong site adaptability;
◆ Modularized design is easy to control, manage and maintain, and is convenient for future upgrade and expansion of stations.
Advanced technological process, high economic efficiency
◆ Advanced MDEA acid gas removal and molecular sieve dehydration process are adopted with mature technology and easy maintenance;
◆ Leading MRC (mixed refrigerant cycle) technical process is used to achieve high economic efficiency.

Control System of Liquefaction Station:
Redundant network to ensure stable system
◆ Redundant Ring / dual network, dual-CPU redundancy control system, 3ms switching, no downtime;
◆ Complying with satellite station construction and future expansion needs;
Independent ESD system, fire and gas alarm system and running control system
◆ 2oo3 Fault-Tolerant Redundant Sensor System
◆ ESD safety protection system to ensure emergency stop and avoid misoperation;
Remote visual monitoring, real-time receiving of operating data
◆ Three-dimensional vision with seamless monitoring for the factory, alarm reminders;
◆ Remote monitoring, real-time information receiving by mobile phones, iPad and other terminals;
◆ Offices and living facilities in work areas, providing comfortable working environment with fixed temperature and humidity.
 
Products & Services
Natural Gas Liquefaction
Gas-to-Liquids Solution
Natural Gas Fueling System
Gas Transportation
Project References
News Search
Product Search
Search
View Annual Financial Report
© Jereh Oil & Gas Engineering Corporation Shangdong ICP No. 11011466 http://en.jereh-gas.com/